TCDD Station and Terminal Buildings
  • CLIENT
  • General Directorate of State Railways Administration

  • TEAM
  • Architectural Conservation:

    Umut Bilgiç, Serkan Songur, Merve Çolak, Oğuz Bostancı, Sefa Er

    Engineering:

    Structural – OPTENG Engineering

    Electrical – PROMETE Engineering

    Mechanical – CG Engineering

  • CONSULTANTS
  • Engineering:

    Structural – Prof. Dr. Uğurhan Akyüz [Middle East Technical University]

    Building Material Analysis:

    Doç. Dr. Ali Akın Akyol [Ankara Hacı Bayram Veli University]

    Art History:

    Tekin Süllü

As a result of the efforts to expand the transportation network in the first years of the Republic, a total of 3,578 km. of railways were built between 1923 and 1950. Filyos, Karabük, Eskipazar and İsmetpaşa train stations and terminal buildings are structures designed and built as typical projects on the Irmak-Filyos line and their construction was completed between 1933-1938.

 

The project includes Documentation-Problem Analysis, Material Analysis, Historical Research-Restitution, Intervention Decisions-Restoration, Landscape Design, Civil, Mechanical and Electrical Engineering projects.

Location

Karabük Station Building Survey Drawings

Eskipazar Terminal Building Survey Drawings

İsmetpaşa Station Building Survey Drawings

Karabük Station Building

Karabük Station Building

Eskipazar Terminal Building

İsmetpaşa Station Building

Filyos Station Building Survey